Request a Quote
Bulk Engineering Procurement & Specification Costing
Submit your steel grades, dimensional tolerances, quantities, and destination port. Our metallurgical and export team will issue a formal quotation with sample MTC and packaging plans within 2 hours.
Procurement & Export Clarifications (FAQ)
What is your MOQ and do you support LCL consolidation?
Standard MOQ varies by product (e.g., 5 tons for coils, 1 ton for pipes). We support LCL mixed container loading from Qingdao/Tianjin ports for trial orders.
How fast can I get a quote, and what is the typical lead time?
Standard specifications are quoted within 2 hours. Production takes 15–30 days, backed by real-time steel mill tracking and logistics milestones.
What certificates do you provide, and is SGS inspection allowed?
We supply EN 10204 3.1 Mill Test Certificates (MTC) with every batch. 100% support for SGS, TÜV, or other third-party inspections before loading.
What payment terms do you accept, and where do you ship from?
We accept T/T (30% deposit + 70% balance against BL copy) and L/C at sight. Main shipping ports are Qingdao Port and Tianjin Port.
Our Quotation & Verification Commitment
- 100% verification of mechanical/chemical property specs by metallurgical engineers
- Direct mill quota allocation checking and fastest port departure schedules
- Official commercial quotation including EN 10204 3.1 MTC sample and seaworthy packing plan
Engineering Procurement Specification Intake
Fill specs below. WhatsApp: +8615688862221